In this terminus, it involves one of the largest Building Management System(BMS) in Hong Kong which control 50,000 hardware points inside the Hong Kong Express Rail Link West Kowloon Terminus.
The 55-km Hong Kong-Zhuhai-Macao Bridge (HZMB), comprising the 12km Hong Kong Link Road, 29.6km Main Bridge and 13.4km Zhuhai Link Road, is the longest bridge-cum-tunnel sea crossing in the world.